Products > Multi-stage Frac System

KW Frac System


Product Number:


We're here to help:
Easy ways to get the answers you need.


  • +86-029-88601839
  • +86-029-88601839
  • kingwell@kingwelloilfield.com
  • Follow Us:
KW Frac System
The KW Frac System delivers unprecedented flexibility for multistage completions. There is no practical limit to the number or spacing of stages. It also isolates and stimulates multiple stages in a single trip on coiled tubing and is typically used in Cased hole. This Hydraulic Jet Frac System works in both horizontal and vertical wellbores. Tool string depth is correlated to desired perforation depth by using a mechanical casing coupling locator. Starting with the lowest stage, the Packer is set to isolate the zone from wellbore below the packer. Then the abrasive slurry is pumped down the coiled tubing string to the Hydraulic Jet Unit. The high-velocity jets cut through the casing and cement and into the formation. After perforating, a leading-edge fluid such acid can be circulated or injected down the coiled tubing/casing annulus. Then the frac is also pumped down the annulus. If screenout occurs, excess sand can be quickly reverse circulated out. Finally, a pull on the coiled tubing unsets the packer, which is then moved up to the next perforation point, where the sequence is repeated.


 
Features and Benefits
 
Simple design and most efficient
Unlimited stages and spacing
Precise frac location
Water and chemical reservation
Unrestricted, production-ready wellbore after frac.
When annular fracturing, the coiled tubing serves as a deadleg for monitoring actual pressure at the frac point to assist in adjusting pad size, sand concentration and ramp, fluid viscosity and pump pressure in real time
When screenout occurs, excess sand can be quickly reverse-circulated out without tripping out of the hole
Equalizing valve allows movement without flowing the well
Hydraulic disconnect unit enables emergency release
Less hydraulic horsepower needed
5 minutes between Fracs. The simple operation of the Multistage Unlimited system cuts the time between fracs to as little as 5 minutes.
Less equipment, less exhaust, smaller footprint. Environmentally friendly fracturing.
 
Related Products:
Online ordering
Your Name:
Email:
Phone Number:
Country or Region:
Message:
 
Products
+Drilling Equipment
+Rig Accessories
+APR Drill Stem Testing Tools
+Mill